CribVentory

Home / New-build paperwork

New-build paperwork: snagging, warranties and appliances

A new home comes with a lot of documents and several separate warranties. Here is what to keep, which dates to record and how to stay organised.

CribVentory listing warranty and service dates

New build, lots of paperwork

A new home arrives with a pile of documents from the developer, plus appliances that each have their own guarantee. It is easy to lose track of which warranty covers what, and when it ends.

What to collect in the first month

  • The structural warranty documents and the builder’s customer care contacts.
  • Building control and electrical certificates, and the boiler commissioning record.
  • Every appliance’s manual, model number, serial number and guarantee end date.
  • Your snagging list, with dates and photos, and the builder’s replies.
  • Meter readings and the stopcock and fuse board locations.

Dates that matter

Your documents will say how long the developer has to fix snagging, how long any structural warranty runs, and when each appliance’s guarantee starts and ends. These differ between developers and products, so read your own paperwork and record every end date.

Photograph the label on each appliance on day one. If something fails later, the model number and serial number are the first things anyone will ask for.

Keep it in one place

CribVentory lets you file each appliance with its model, serial number, receipt and warranty date, room by room, with a list of what is due next. It is the paperwork pile, organised.

Frequently asked questions

Are appliances covered by a new-build warranty?

Check your structural warranty documents to see exactly what is covered, and ask your developer if anything is unclear. Appliances normally come with their own manufacturer guarantees, so keep that paperwork and record the end dates.

What is snagging?

Snagging is the process of checking a new home for defects and unfinished work and listing them for the builder to fix, usually within an agreed period.

What paperwork should I keep for a new build?

The reservation and completion documents, the structural warranty, building control and electrical certificates, appliance manuals and guarantees, and the builder’s customer care contact details.

Congratulations on the keys. We’ve got the admin.

Seven days free. Then £20 a year, about £1.67 a month. Add your first appliance in a few taps.